You don't need to know how training works. Only that you want to run.
Three easy runs a week, nothing hard in the first two weeks, every session explained in two sentences.
How to start →Every run reviewed. Overload spotted early. Your training adapted to your body every day. From your first 5K to the finish line.
paceos turns that into your way to the goal.
paceos reads your level from your data, not from a questionnaire.
Three easy runs a week, nothing hard in the first two weeks, every session explained in two sentences.
How to start →Your week built around your life, the session on your watch, the run back in the plan.
How a week works →Readiness against your own baseline, key sessions that grow with you, load tolerance from your data.
The runner model →Phases up to race day, recovery weeks, pacing and fueling on the day.
Marathon training plan →Pace, zones, load, efficiency, training effect. And what it means.
Threshold pace, zones, form and personal bests from your real runs. No table comparison.
Acute versus chronic load, two hard days, easy runs too fast. Before it tips, the plan gets more careful.
How long you need, how much you tolerate, what a short night costs you.
Every morning paceos weighs how recovered you are, what the last days cost you and what your plan has in store. Then it adjusts the session. With reasons, in one sentence.
No fighting today. The hard stuff waits.
A little less, but not softer.
Your plan, as intended.
Good days come as an offer, not an obligation.
Your recovery is below your baseline, load over the last 48 hours is high. Today 2x10 instead of 3x10, intensity unchanged. Long run moves to Thursday.
Two short nights and Tuesday's hard session are still in your legs. Run the two blocks cleanly at 4:49 to 5:00 and you will have fresh legs on Thursday.
One tap on ↺ restores the planned session.
Short night, heart rate slightly up, recovery below your baseline.
3x10 minutes becomes 2x10, the long run moves to Thursday. Before you put the coffee on.
Why, with target pace and fresh legs on Thursday.
One tap. The session is on your Garmin, with pace and heart-rate ranges.
The run comes back, is compared with the plan, and you say in one tap how it felt.
Did the decision work? Next time paceos decides a little more like your coach.
Clear phases up to race day. Most of it stays easy.
Every run flows back into the plan. A template does not know that. paceos learns it.
You pick run days and long-run day. Strength and mobility are scheduled.
Report a niggle and the plan goes easy; after a break it brings you back gently.
Automatically, while you sleep.
Against yourself, not the average.
Reasoned, and one tap back.
You press start.
A bit more your coach every day.
paceos does not replace your watch. It uses it.
The finished session with pace and heart-rate targets is on your wrist before you lace up.
Garmin · COROS · Wahoo · Apple Watch
Sleep, HRV, resting heart rate and breathing rate arrive automatically while you sleep.
Garmin · COROS · Apple Health (Apple Watch)
Every run flows back into the plan and your runner model, whatever you recorded it with.
Polar · Zepp · Strava · all of the above
As of October 2026. Apple Watch receives structured workouts from iOS 17.
From up to 120 days of your data. Example values:
How long you need after a long run.
How much more than usual you tolerate.
What a short night costs you.
Tolerated so far without a dip.
Ask anything. It knows your data and remembers what you tell it.
Pacing, in-race fueling, carb loading beforehand.
Decision and readiness on your wrist and lock screen.
Run with friends. Kilometres are shared, never heart rate or sleep.
In short: paceos is a running app for iPhone that guides you from your first run to race day. It builds your plan for 5K to marathon, reviews every run, measures progress against your own numbers, spots overload early and adjusts each session in the morning to sleep, recovery and load. Ready on Garmin, COROS, Wahoo or Apple Watch. paceos makes the decisions itself; a coach chat explains them. 7 days free, then €59.99 per year or €1.99 per week.
Runners with an iPhone, from beginner to marathon. paceos detects your level from your data: under two runs a week you start with three easy sessions, structured runners get threshold, intervals and long runs.
Workouts to Garmin, COROS, Wahoo and Apple Watch. Sleep and recovery from Garmin, COROS and Apple Health. Import from Polar, Zepp and Strava. As of October 2026.
7 days free, no payment details. Then €59.99 per year or €1.99 per week, cancel any time. Every feature in both plans.
Most show data or hand you a plan. paceos connects both into a daily decision: every run reviewed, progress on your numbers, overload spotted early, today's session adjusted. With reasons, on any watch, for every level.
For the daily decision, yes, because paceos needs sleep, HRV and resting heart rate. Apple Watch, Garmin or COROS is enough.
Used only for your training, never sold, never for advertising. No ad tracking. Everything is in the privacy policy.
Try it free for 7 days, no payment details needed. Then €59.99 per year or €1.99 per week. Cancel anytime.
For iPhone running iOS 15.1 or later, with an Apple Watch app. All values on this page are examples. paceos does not replace medical advice. If you are in pain, ill or unsure, your body and your doctor decide.